Guide 07

What interior designers charge in Dubai, and what the fee buys

Written by the studio · About interior design · Updated 20 September 2026

How much do interior designers charge in Dubai, and what is included in the fee?

Interior design fees in Dubai are unregulated and no UAE authority publishes a fee scale, so what you pay turns on which of four models the studio uses: a percentage of the construction and procurement cost, a rate per square foot of designed area, a fixed fee per stage or package, or a design fee carried inside a single design-and-build contract. The nearest thing to an independent measure is JLL's EMEA Office Fit-Out Cost Guide 2025, which put professional services at 10 per cent of a Dubai office fit-out budget, and that share covers every consultant on the job rather than the designer alone. A quoted fee only means something once you know the build cost it sits on and which drawings it produces.

The four ways a Dubai studio prices the same job

Three studios can look at the same three bedroom villa and quote in three different units of measurement. One returns a percentage. One returns a rate per square foot. One returns a single number with a list of deliverables under it. None of them is wrong, and none can be compared with the others until you convert them into the same thing.

Fee modelHow it is quotedWhen it usually appliesWhat it leaves open
Percentage of build costA share of the construction and procurement value, drawn down in stagesProjects where the scope is still moving and the budget is the fixed pointThe percentage means nothing until the build cost is fixed, and the fee rises with the build
Rate per square foot of designA rate applied to the designed areaApartments and single floors with a clear boundaryWhether the rate covers technical and authority drawings, or stops at concept and visuals
Fixed fee per stage or packageOne amount per deliverable, or one amount for a defined packageOwners who want the option to stop after concept, or to tender the build separatelyEverything outside the package: extra revisions, site visits, authority submission
Design inside a design-and-build contractDesign carried in the same contract as constructionOwners who want one party answerable for both the drawing and the buildingThe split between design and build, which should still be broken out on the quote
The four fee models used in the Dubai market, and what each one leaves open

Which model a studio offers tells you what it is set up to do. A percentage suits a practice that stays on the job to the end, because the fee only makes sense measured against a finished build. A fixed package suits a studio selling drawings. Our interior design page lists the stages we work in.

What the published figures actually support

There is no government fee scale for interior design in the UAE. No ministry, tariff page or professional body publishes one. Design fees here are neither regulated nor surveyed, and most figures online are published by a studio or a contractor selling the service. That is the reason the ranges you find contradict each other.

Two independent measurements do exist, both from property and cost houses rather than designers. JLL's EMEA Office Fit-Out Cost Guide 2025 (May 2025) splits a Dubai office fit-out into builders' works 36 per cent, mechanical and electrical services 30 per cent, furniture, finishes and equipment 11 per cent, security, IT and audio-visual 13 per cent, and professional services 10 per cent. JLL's 2026 edition (14 May 2026) drops the per-city breakdown and gives 9 per cent as an EMEA average. West Gate Real Estate, a Dubai commercial agency, puts design and consultancy at 8 to 12 per cent of a commercial fit-out budget (10 December 2025), which lands in the same band by a different route.

Against those measured shares sit the asking rates. One Dubai studio's published pricing guide (Kat Black Design Studio, 12 April 2026) advertises 10 to 20 per cent of construction and procurement cost for luxury residential design, and a fixed design fee of AED 15,000 to AED 150,000 by property size. That is what a studio asks for, which is a different quantity from what projects are measured to allocate. Both are worth knowing. Averaging them produces a number that describes nothing.

What the fee should buy, stage by stage

A fee is only comparable against a list of deliverables. These are the stages a full interior appointment runs through. A quote that is cheaper than another is usually cheaper because it stops earlier on this list.

  1. Brief and measured surveySomeone measures the property as built, not as drawn. Existing drawings are often out by enough to move a wall line, and every later stage inherits the error.
  2. Concept designLayout options, materials, a written scope. This is the stage where the budget is either tested against reality or left to be discovered on site.
  3. 3D visualisationVisuals of the agreed concept. Ask how many rounds of revision are in the fee, because this is the most common place for extra charges to appear.
  4. Technical and joinery drawingsSetting out, elevations, ceiling and floor plans, joinery details. This is the set a contractor actually builds from, and the set that a concept-only package does not include.
  5. Mechanical and electrical coordinationLighting, power, cooling and drainage coordinated against the design. Left out, it returns as clashes on site and as variation orders.
  6. Authority submission drawingsThe drawing set prepared and submitted for approval where the work needs it. Check explicitly whether this sits inside or outside the fee, and who signs it.
  7. Tender, pricing and awardTurning the drawings into a priced contract. On a design-only appointment, this is where the designer's involvement thins out.
  8. Site supervision, procurement and handoverSite visits during construction, ordering and tracking furniture and joinery, then snagging. Each of these is separately chargeable in most fee structures.

The fixed-fee model above is a useful illustration because the studio states its boundary: concept design, 3D visualisation, technical drawings and procurement supervision are in, construction is managed separately, and authority submission drawings and site supervision are not included (Kat Black Design Studio, 12 April 2026). That boundary is normal for design-only work, and it is exactly where a project stalls.

Where design-only ends and design-and-build begins

Design-only ends at a drawing set. After that, someone still has to price the work, hold the construction contract, carry the approvals and answer for the result. A design-and-build appointment puts those in one contract with the design, which is why the design fee inside it is often not quoted separately unless you ask.

The two sides are regulated separately. Dubai Municipality sets licensing standards for consultants and for contractors as distinct activities (page last modified 19 September 2026) and keeps a Consultants and Contractors Register, which is a separate registration from the trade licence issued by Dubai's Department of Economy and Tourism. Check that the licence in front of you lists the activity you are buying.

HST runs as a design-and-build practice, so the team that draws the project also builds it, and the interior and the fit-out sit under one renovation and fit-out appointment rather than two. You can see how that reads on a finished interior in our penthouse redesign in Dubai Marina.

How to compare two quotes that are not quoting the same thing

Put the two quotes side by side and resolve these lines before you look at the totals. In most cases the difference between a high quote and a low quote is not the rate. It is the scope.

Line to checkWhat to ask for in writingWhy it moves the number
Area basisThe exact area the fee is calculated on, and whether it is built-up or internalBuilt-up area and internal area are not the same number, so the same rate produces two different fees
Drawing setA list of drawings issued at each stageConcept-only and construction-issue packages are different amounts of work
Authority submissionWhether submission drawings are included, and which entity signs themThis is the most common exclusion, and the hardest to buy separately later
Site attendanceNumber of site visits, or a named supervision periodSupervision priced by visit and supervision priced by month are not comparable
ProcurementWhether furniture is charged as a fee, a margin on goods, or supplied at costA low design fee with an undisclosed margin can be the more expensive quote
RevisionsHow many rounds are included at concept and at 3D stageUnlimited revisions do not exist. Unstated revisions become variations
Tax and build cost basisWhether figures are stated before or after tax, and what build cost a percentage fee assumesTurner & Townsend's own benchmarks exclude taxes, so a benchmark and a quote are often not on the same basis
Seven lines to resolve before comparing design fee totals

If a studio will not put those seven lines in writing before contract, that is the answer to the comparison. We are happy to set our own scope out line by line so it can be read against anyone else's.

The build cost a percentage fee sits on

If the fee is a percentage, the build cost decides it, and published Dubai build rates disagree with each other by a factor of two. They are not arguing. They are measuring different things.

BenchmarkFigureScope it assumesSource and date
Office fit-out, high specification, Dubai and Abu DhabiAED 13,946 per sqm, about AED 1,296 per sqftCategory A plus Category B from shell and core, on a standard test fit of about 4,294 sqm over two floors in a business district. Includes loose furniture, audio-visual and professional fees. Excludes taxes and liftsTurner & Townsend, Global Office Fit-Out Cost Guide 2026, Q1 2026 cost base
Office fit-out, medium specification, Dubai and Abu DhabiAED 11,077 per sqm, about AED 1,029 per sqftSame test fit, inclusions and exclusions as aboveTurner & Townsend, Global Office Fit-Out Cost Guide 2026, Q1 2026 cost base
Office fit-out advertised by Dubai fit-out contractorsAED 180 to AED 900 per sqft, standard to premium gradeCategory B work where the landlord has already delivered Category A. Standard covers partitions, carpet tile and basic services. Premium adds custom joinery, stone and automationWest Gate Real Estate, 10 December 2025
Villa renovationAED 150 to AED 600 per sqftWhole villa, cosmetic through premium. No villa size stated, and permits, design fees and landscaping are not said to be includedProperty Finder, 25 March 2026
Apartment renovationAED 50 to AED 200 per sqftStandard apartment renovation. No apartment size statedProperty Finder, 25 March 2026
Published Dubai build and fit-out benchmarks, with the scope each one assumes

The gap between the first row and the third is the one to understand. Turner and Townsend prices a corporate floorplate from bare shell, including furniture and fees. The contractor figures price a refresh of a space that already has ceilings, floors and services in it. Both can be true at once. Ask which of the two your quote is built on.

Direction of travel is consistent across both houses. Turner and Townsend's high specification figure rose from about AED 12,848 per sqm in its 2025 edition, as reported by Gulf Construction on 4 July 2025, to AED 13,946 per sqm in 2026, roughly 8.5 per cent. JLL's 2026 guide reports a 5 to 7 per cent year on year increase across EMEA and records Dubai reporting excessive material lead times. Residential numbers move too, which is why we keep a separate page on what a villa renovation costs in Dubai.

Deposits, stage payments and retention

No law and no authority in Dubai sets a deposit for design or fit-out work. The percentages you will read online, the familiar 30 or 40 per cent up front, come from studios and contractors publishing their own terms, with no government or law firm source behind them. Read them as asking terms and negotiate them like any other term.

DLA Piper sets out what that means (8 October 2025): the UAE has no construction payment statute of the kind found in the UK or Australia, no statutory adjudication, and no requirement that your money be ring-fenced. The contract is the protection. Tie every payment to something you can see: a signed scope, an issued drawing set, a delivery on site.

Retention on the build side is practice, not law. DLA Piper records the usual position as 10 per cent of contract value, half released at handover and half at the end of the defects liability period, and that period is usually twelve months from handover as a contract term rather than a legal minimum (Chambers and Partners, 24 July 2024). If it is not written into your contract, you do not have it. More on this in our guide to checking and paying a contractor.

Checking the studio before you pay anything

A Dubai mainland business needs a trade licence from the Department of Economy and Tourism, formerly the Department of Economic Development. The UAE government portal at u.ae, updated 6 April 2026, lists the channels for checking one: the federal National Economic Register, and for Dubai, the Department of Economy and Tourism's e-services search and the Invest in Dubai platform.

Contracting has moved recently. Dubai issued Law No. (7) of 2025 regulating contracting activities, announced by the Dubai Media Office on 12 July 2025, under which contracting runs through a single Dubai Municipality system for registration, classification and oversight. It came into force on 8 January 2026, and existing contractors have until 8 January 2027 to comply (Kennedys, July 2025). The Dubai Media Office release puts penalties at AED 1,000 to AED 100,000, doubling for a repeat breach within a year to a maximum of AED 200,000.

Dubai Municipality has also updated a Contractor and Engineering Consultancy Rating System, in force from early 2026, which owners feed through surveys on its Build in Dubai platform (Gulf News, 29 June 2025). Whether those scores can be looked up by a prospective client has not been stated publicly, so do not plan on browsing ratings. Ask for the licence and the registration, then check them yourself. If the work needs approval at all, our guide on which authority your renovation needs sets out the routes.

Sources

Figures and rules on this page come from the sources below. Where a number is ours, it says so. Rules and fees in Dubai change; the date beside each source is when we read it.

  1. JLL, EMEA Office Fit-Out Cost Guide 2025 (Dubai cost categories, page 11) May 2025
  2. JLL, EMEA Office Fit-Out Costs Guide 2026 (typical fit-out cost breakdown, page 7) 14 May 2026
  3. Turner and Townsend, Global Office Fit-Out Cost Guide 2026, Dubai and Abu Dhabi 2026 edition, Q1 2026 cost base date
  4. Turner and Townsend, Global Office Fit-Out Cost Guide 2026, methodology and exclusions 2026 edition, Q1 2026 cost base date
  5. Gulf Construction, reporting Turner and Townsend's 2025 fit-out figures 4 July 2025
  6. West Gate Real Estate, commercial fit-out cost benchmarks for Dubai 10 December 2025
  7. Kat Black Design Studio, Dubai interior design pricing guide 12 April 2026
  8. Property Finder, cost comparison of apartment and villa renovation in Dubai 25 March 2026
  9. DLA Piper, Global Construction Bulletin, Security of payment: UAE 8 October 2025
  10. Chambers and Partners, Retentions in UAE Construction Contracts 24 July 2024
  11. Dubai Municipality, Consultants and Contractors Licensing Standards Page last modified 19 September 2026
  12. Dubai Media Office, Law regulating contracting activities in Dubai 12 July 2025
  13. Kennedys, Dubai Law No. 7 of 2025: a new era for the construction sector July 2025
  14. u.ae, the official platform of the UAE government, verify business licences Updated 6 April 2026
  15. Dubai Department of Economy and Tourism, licences and permits Accessed 20 September 2026
  16. Gulf News, Dubai to launch new contractor rating system by 2026 29 June 2025
Questions

Questions we are asked next

Nothing published measures the return, so treat anyone who quotes you a figure with suspicion. What the cost data does show is the size of the bet: in JLL's 2025 guide, professional services, meaning every consultant on the job rather than the designer alone, accounted for 10 per cent of a Dubai office fit-out, against 36 per cent for builders' works and 30 per cent for mechanical and electrical services. The design decisions that drive the other 66 per cent are made before anyone orders material, which is where a designer either earns the fee or does not.

No independent source compares the fee levels of the two, so the useful question is not price but who carries the work. Ask which entity holds a Dubai licence covering the activity, whether it is registered with Dubai Municipality, who signs and submits any drawings that need approval, and who physically attends site during construction. A name on a concept deck does not answer any of those.

There is no independent Dubai price for either. In the one published model we can cite, a studio folds 3D visualisation and procurement supervision into a fixed design fee of AED 15,000 to AED 150,000 by property size (Kat Black Design Studio, 12 April 2026). Ask the two questions that decide the real cost: how many rounds of render revision are included, and whether procurement is charged as a fee, as a margin on the goods, or supplied at cost with the invoices shown to you.

Check the trade licence, check that it lists the activity you are buying, and check the Dubai Municipality registration for whoever will build. Then read the fee against a written list of deliverables rather than against another fee. A studio that will commit in writing to the drawing set, the authority submission and the site attendance is easier to hold to than one offering a lower number with a shorter list under it.

No public source states that rule plainly, so we will not pretend to one. What is documented is that Dubai Municipality treats engineering consultancy and contracting as separate regulated activities with their own licensing standards, and keeps its own Consultants and Contractors Register alongside the Department of Economy and Tourism trade licence. The practical test is to ask, before you pay, which licensed entity will sign and submit, and then check that entity yourself.
A completed HST Architects roof garden in Dubai, lit at night
Start here

Ask for a scoped fee Design only, or design and build, priced against a written scope

Send us the property, the area and what you want changed, and we will come back with the stages, the drawings each one produces and what sits outside the fee. Office 1603, Burj Khalifa, Downtown Dubai.

WhatsApp